11 automatic molding machines dismantled in Moskovskaya Oblast

Within the period from May, 3 to May 14, 2016 our specialists dismantled 11 automatic molding machines within the premises of LG plant in Dorokhovo, Moskovskaya Oblast, packed them for sea transportation, loaded into containers and secured them there. The works were performed in confined space within the premises of an operating plant under pressure of time. The total weight of the equipment to be dismantled was 240 tons. High professionalism of our specialists allowed them to fulfill the operations in the shortest possible time and to ship the equipment to the port in time for further transportation to Vietnam.