Dismantling of equipment for JSC UralKhimMash

    From March to April 2012 the company 100 tonn – service performed dismantling of the architrave assembled with master cylinder piston (weight of 200 tons), master cylinder body (weight of 80 tons), and traverse (weight of 90 tons) of the vertical four column hydraulic double-acting press with forcing of 4000/6500 tnf with all elements of the tilting by 90 ° about the horizontal axis at the production site of UralKhimMash (Ekaterinburg).