Dismantling, moving and mounting of the machine for suspension members production

    From April, 18th, till May, 3rd, 2013 company 100tonn-service engineers relocated the machine for suspension members production (manufactured by Benteler International AG – Germany). The total weight of the machine was 50tons. The works were executed at DAAS, OJSC.
    The machine was dismantled, loaded on trucks, then it was transported to the new place, unloaded and mounted. Oversized and heavy units were transported on special trucks. All the required permissions from authorized authorities were received. The equipment was insured. The machine was to be dismantled at a working factory in limited space. The unique handling technique and use of lifting gantry GP125 made it possible to control the loading of all 8 slings fixed on frame (length – 10meters, weight – 45 tons).
    The works were complicated by the possibility of the frame fracture and spin.