Primavera mixer installed in Yekaterinburg

    In the period from May to December 2016, our Company (100 TONN MONTAZH) installed Primavera mixer for Unilever Russia (OOO, production site of Concern Kalina). This machinery is a complex energy-consuming assembly for preparation of required mixtures for the production of cosmetics. All possible engineering resources and skills of our Company’s specialists were involved in the installation works in conditions of an operating plant. The works were complicated by special requirements set forth for occupational safety and ecology. The implementation of this project required complicated installation operations in compliance with the OEM recommendations. Introduction of the mixer into existing technological process also turned out to cause some problems. Despite certain problems and thanks to the assistance of installation supervisors, the machinery was successfully installed inside an operating workshop.