Assembly of presses LAUFFER and conveyer belts SCHLATTER for production of radiators in Engels

In the period from November 26 to December 22, 2014 our Company (100-tons montage) tipped and set two LAUFFER presses (32 tonnes each) to final position according to the project, as well as participated in the assembly of supporting equipment of SCHLATTER conveyer belts for production of heating radiators at the plant Evroradiator (OOO) in Engels.

The presses were assembled in confined space. In accordance with the Work Method Statement the gantry system was rearranged four times. The Customer noted high professionalism and self-discipline of the personnel of our Company.