Gas turbine rotor Alstom transferred at Chelyabinsk State Power Station

Within the period from October, 22 to October, 26 on request from Instar Logistics (OOO) our Company transferred a 92-tonne gas turbine rotor (manufactured by Alstom, Germany) from a rail transporter onto a truck with its further unloading at a temporary storage site within the premises of the power construction site at Chelyabinsk State Power Station.