Press SACMI loaded, transported, turned over and installed in Yekaterinburg

In April 2014 our Company loaded press SACMI РН3800 (Italy) from a railway transporter on to a modular trailer, transported it into a production workshop, unloaded from the modular trailer, turned it into its vertical position, set on a foundation (with the basic part being leveled), and secured it at the production site of Zavod keramicheskikh izdely (Ceramic plant, OAO), Yekaterinburg.

Unique engineering solutions enabled simultaneous operation of two gantry systems with different capacities, which made it possible to mount the press in a confined space.