Energy equipment shifted and unloaded at Verkhnetagilsky State Power Station

In April 2016 our Company (100 TONN MONTAZH) loaded and shifted a 57-ton low pressure rotor, a 175-ton low pressure stator and a 24-ton high pressure rotor from a temporary storage site to the main building at the construction site of Verkhnetagilsky State Power Station in Verkhny Tagil (Sverdlovskaya Oblast).

A special slinging scheme with the use of pins was designed for lifting of the low pressure rotor. The works were complicated by the necessity to shift the loads along narrow washed out clay roads under the rain.

All the works were performed at a very high speed ahead of the originally approved schedule.