Ventilation equipment lifted and arranged in Togliatti

In May 2016 our specialists (100 TONN MONTAZH) successfully shifted, lifted and arranged ventilation equipment from the Togliatti port to the territory of special economic zone Togliatti on request from OZON FARM company.

A special installation platform was designed and manufactured to lift the equipment to the second floor of a new factory building under construction. A truck crane was used for lifting the equipment onto the roof.