Works carried out in the steam generator manufacturing workshop

In the period from 8 AUG to 24 AUG, our Company (100 TONN MONTAZH) installed tanks and pumps for a cleaning loop line in a newly built steam generator manufacturing workshop at Afrikantov Experimental Design Bureau (OAO).
The works were performed at different heights in confined space. Nevertheless they were accomplished with high quality and in due time.