Unloading and installation of press Schuler in Tolyatti

From August,1st, till August, 7th, 100TONN – service engineers executed complicated project (customer was POLAD, CJSC) of unloading from automobile trawl, moving into the building and mounting into the pit notching press Schuler (Germany). The main part of the press is monoblock unit, weight 134tons. The press, 5750mm in the width, couldn’t fit between the columns on its way to the place of mounting what was the main difficulty of the project. And thus, the engineers had to turn it several times in different directions. The works were executed by the hydraulic gantry system GP1100, lifting capacity 1100tons. The plan of works execution was designed by 100TONN – Service technical engineering department.