Three machining centres, measuring machine unloaded and assembled, two turning machines disassembled in Yekaterinburg

    In January 2015 our Company completed the following works: unloading, shifting to the site and assembling of three machining centres and a measuring machine, as well as disassembling of two turning machines at production site of DB Novator in Yekaterinburg.

    The equipment was delivered to the plant as separate units within eight months, so our specialists had to leave for the site more than once by the time of the arrival of the equipment. A brand new gantry system GP60 was used for the assembly of the measuring machine in confined space. This gantry system arrived to our Company on the New Year’s Eve and consists of eight gantries. The assembled equipment has been set to work