Milling machine unloaded, shifted and installed in Yekaterinburg

In January 2014 our Company (100 TONN MONTAZH) unloaded a milling machine from a vehicle, shifted it to a production site and installed it at DB Novator (OAO) in Yekaterinburg. Rigging operations were performed in a confined space of an operating plant with application of modern technologies and thorough engineering.