Metal-working machine unloaded, shifted and installed in Yekaterinburg

In February 2014 our Company unloaded a multipurpose metal-working machine from a vehicle, shifted it into a production workshop and set on a foundation at the production site of DB Novator (OAO) in Yekaterinburg. The rigging operations were performed in a confined space of an operating plant within the prescribed time limits.