Five metal-working centres unloaded, shifted and set on a foundation in Yekaterinburg

    In the period from March to July 2014, our Company unloaded five metalworking centres, shifted them to the production workshop and set them on a foundation at the production site of DB Novator (OAO) in Yekaterinburg.

    The rigging operations were performed in a confined space of an operating plant: special overlapping construction schedules were finalized; separate units of operating equipment were switched off during a specific period of time to ensure access to the new machines. All the works were accomplished within the prescribed time limits without frustration of production plans of the company.