Heating boiler UT–L UNIMAT (BOSCH) unloaded, shifted and installed in Yekaterinburg

On request from Block-Modular Boilers Plant Energoleader (ZAO) within the period from August, 26 to August, 29 our Company performed unloading, shifting and setting on a foundation of a 42-tonne heating boiler UT–L UNIMAT (BOSCH, Germany) in the boiler-room of housing estate Universitetsky in Yekaterinburg. The heating boiler was shifted with the help of a 40-tonne capacity intrashop trailer to the distance of 250 m. Then the boiler was lifted together with the trailer with the help of 400-tonne capacity hydraulic jacks, unloaded from the trailer and set on a foundation.