Energy equipment shifted and unloaded at Verkhnetagilsky State Power Station

In April our specialists (100 TONN MONTAZH) loaded and shifted SIEMENS rotors and stator. Total weight of the equipment is 256 tons. The transportation was performed under the rain along the washed out clay roads, which, nevertheless, did not prevent us from work accomplishment ahead of the schedule. See the details in section Projects.