29 Jun 2016

Pod drives installed aboard Vsevolod Bobrov vessel

In July 2016 our Company (100 TONN MONTAZH) unloaded, shifted, lifted and set to final position two pod drives (manufactured by Steer Prop; 163 tons each) at the production site of Severnaya Verf dockyard in St.Petersburg.

To set the pod drives to final position, roll and trim must be created in confined space under the stern of the vessel. The works are complicated due to the presence of small and large propellers both installed on each pod drive. The works were accomplished in accordance with the approved schedule. It must be noted that this was the second project of pod drives installation, and the Customer again expressed his gratitude for our professionalism.

26 May 2016

Equipment lifted and held in suspended position to carry out repair operations

On May, 26 our specialists completed the lifting works and the works of holding the equipment in suspended position during repair operations with preservation of geometric integrity of the equipment.

Since the equipment of the customer represented a complicated system consisting of five axial wheels, lifting and preservation of geometry required slings of the same length. Mass-dimensional characteristics of the load were 9,000х4,000х3,000 mm, mass 25 tons. Holding the equipment in suspended position was carried out by means of a GP125 gantry system, which enabled the customer to fulfill repair operations in the shortest possible time with no production downtime.

24 Dec 2014

Indian hydraulic SMC-press mounted in Moscow

At one of the companies in Moscow our specialists unloaded a 900-tonne hydraulic press for SMC-pressing, set it to final position and hooked it up. Hydraulic gantry system GP-125 was used to turn the press frame, to shift the table, hydraulic cylinder and a slide for assembly.

20 May 2014

Passenger cars Talgo unloaded from a railway transport in Moscow

In the period from April 3 to April 6 on request from GEFCO (OOO) our Company unloaded 20 passenger cars of a high-speed train Talgo (Spain) from the flat wagons within the territory of Kievsky Railway Station in Moscow. The passenger cars were unfastened, lifted from the flat wagons and put onto the railway tracks.

The total weight of the passenger cars was 320 tonnes. It was the first time that Talgo has used a 125-tonne capacity hydraulic gantry system GP125 to unload the cars. The use of the gantry system assured the required positional precision which allowed our Company to accomplish the works within 3 days.