General Electric gas turbine power unit installed at Yakutskaya GRES-2

In the period from 15 JUL to 03 AUG 2015 our Company set on a foundation four sets of General Electric gas turbine power unit at Yakutskaya GRES-2 (regional hydro-electric power plant) in Yakutsk. Each gas turbine power unit consists of four parts, i.e. turbine, generator and two auxiliary elements. Total mass of the assembled equipment is 840 tonnes. GP500 hydraulic gantry system was used for operations.

In the harshest conditions of the construction site of Yakutskaya GRES-2 our specialists showed their high qualification and skills that allowed them to carry out all the works in strict compliance with the work schedule approved by ZAO SMU SZEM and general contractor OAO TEK Mosenergo.