Transformеrs loaded and unloaded at Novovoronezh NPP-II

    In the period from September 25 to October 1, 2014 our Company (100 TONNE SERVICE) loaded four transformers at the temporary storage site, then unloaded them at the construction site of Novovoronezh Nuclear Power II and set them to final position. The transformers are produced by Electrozavod (OAO, Moscow).

    The mass of each transformer is 300 tonnes. Our specialists used a 450-tonne capacity system SGP-450 for loading, whereas unloading was performed with a 500-tonne gantry system GP-500. Only five shifts were required to fulfill the project as loading and unloading operations were carried out simultaneously.

    The use of the gantry system for unloading allowed precise positioning of the transformers when they were rolled over. Optimal selection and combination of equipment used by our specialists delivered the highest standard of quality and enabled them to accomplish the works within short time.