Turbine generator adjusted and gap-measured

In the period from 26 JUL to 24 AUG 2016, our Company on request from Design Machine-building Bureau Gorizont, a branch of Gas-Turbine Engineering Research and Production Centre Salut (AO) adjusted Т-⁠25-⁠23РУЗ-⁠ГВ turbine generator and measured its gaps. This kind of services is one of the new services provided by our Company. This project allowed us to get invaluable experience in with turbine generator installation. Under supervision of an experienced advising engineer our specialists carried out all necessary installation operations.