Containers with medical equipment loading in ST. Petersburg

July, 13th – 19th, at storage terminal “Alers Saint-Petersburg” company 100tonn-service engineers loaded containers with medical equipment on container vehicles for further transportation to the Dimitrovgrad Proton Therapy Center, which is under construction at the moment. The use of gantry technology made it possible to accomplish loading carefully and in contract terms in tight working space and limited time. 39 containers (both 40- and 20-foot) with total weight of 469tons were handled.