Loading and unloading of transformers at Novovoronezh Atomic Power Station-2

Since December, 11th, till December, 21st, 2012, 100TONN – SERVICE engineers loaded and unloaded 10 transformers Hyundai, weight 64tons – 215tons, at Novovoronezh Atomic Power Station-2. The transformers were loaded on automobile trucks at heavy equipment store house, and later after transportation were unloaded and placed on the mounting site at Atomic Power Station. The total weight of all transformers was 970tons. The works were excuted with the lifting system GP1100, lifting capacity up to 1100tons.