Rigging operations performed at Urals Pipe Works

On request from Urals Pipe Works, OAO our Company (100 TONN MONTAZH)  unloaded a 80-ton screw press and a 46-ton trimming press, relocated them to the installation site, tipped and installed them.  Two gantry systems (125-ton-capacity each) were engaged for relocation and tipping of the press machinery. High skills of our specialists enabled them to fulfill the works with high quality and in due time.